Sign In | Join Free | My gimpguru.org
China Hangzhou Hangyang Cryogenic Liquefaction Equipment Co., Ltd logo
Hangzhou Hangyang Cryogenic Liquefaction Equipment Co., Ltd
Hangzhou Hangyang Cryogenic Liquefaction Equipment Co., Ltd Become a World-class Air Separation Unit And Gas Operation's Specialist.
Active Member

9 Years

Home > Air Separation Plant Engineering Project >

Coal Mine 350 Nm3/h Air Separation Plant Engineering Project EPC Small Size ASU O2 N2

Hangzhou Hangyang Cryogenic Liquefaction Equipment Co., Ltd

Coal Mine 350 Nm3/h Air Separation Plant Engineering Project EPC Small Size ASU O2 N2

  • 1
  • 2
  • 3

Brand Name : HANGYANG

Model Number : Coal Mine 350 Nm3/h Air Separtion Plant Engineering

Certification : CE/ASEM/GB

Place of Origin : China

MOQ : 1 SET

Price : according to actual requirement

Supply Ability : according to actual requirement

Delivery Time : according to actual requirement

Packaging Details : wooden case, nude packing, container

Type : EPC

Service : Design , installation , management

Package : Seaworthy packing

Contractor : Hangyang

Contact Now

Coal Mine 350 Nm3/h Air Separtion Plant Engineering

Design Basis:

(1)< Code of Design on Building Fire Protection And Prevention>GB50016-2006;

(2)HG/T20675-1990;

(3)HG/T20592~20635-2009;

(4)GB/T12459-2005;

(5)GB50316-2000(2008 Edition);

(6)GB/T8163-2008;

(7)GB/T14976-2012;

(8)GB16912-2008;

(9)TSG D0001-2009;

(4)Current station specifications and standards for oxygen station.

Layout of equipments:

Coal Mine 350 Nm3/h Air Separation Plant Engineering Project EPC Small Size ASU O2 N2

Pressure test

1. The strength and leakproofness test should be done after finishing the installation of pipes,. Except the circulating cooling water pipes employ the clean and oil-free water as the medium to do strength and leakproofness test, other process pipes must use dry and clean air to blow-dry after water pressure strength test; if use the clean and oil-free air or nitrogen for strength test, the effective safety measures should be taken.

a) Hydraulic pressure test is taken as strength test

The pressure for pipe hydraulic pressure test should be 1.5 times of design pressure, and the test medium should be oil-free clean water. Hydraulic pressure test should be rose slowly, when it reaches the test pressure, keep the pressure for 10min, and then reduce the pressure to design pressure, and keep for 30min, and it is qualified only when there is no pressure drop and leakage.

b) Air pressure test is taken as strength test

The pressure for pipe air pressure test should be 1.15 times of design pressure, and the test medium should be oil-free air or nitrogen. When air pressure test, the pressure should be rose slowly, when the pressure reaches the 50% of test pressure, there is no unusual appearance or leakage, and then rise the pressure by 10% of pressure test step by step, keep pressure in the each step for 3min, until to the test pressure and be kept for 10min, and then reduce the pressure to design pressure, and the keeping time will be based on the leakage checking work, and it is qualified when the foaming agent is checked without leakage of air.

c) Leakproofness (gas tightness) test

The pipe leakproofness (gas tightness) test pressure should be 1.0 time of the pipe design pressure, and the test medium will be oil-free air or nitrogen, and it is qualified when the foaming agent is checked without leakage of air. Leakproofness(gas tightness) test method is according to the requirement of item 3.4.3 in GB50274. Leakproofness(gas tightness) test method is according to the requirement of item 3.4.3 in GB50274.

d) The air separation plant integral leakproofness test will be according to the stipulations in the technical files provided by the manufacturer. Leakproofness test method is according to the requirement of item 3.4.3 in GB50274.

Competitive Advantage:

(1) Our company owns the national enterprise technical center

(2) Impeccable quality management system

(3) Powerful manufacturing capacity

(4) Our company has the strong ability for supporting, and steady after-sale service

(5) Engineers available to service machinery overseas

(6) Our company is a state-owned enterprise that can give professional consult, design, supervision, project management, import and export trade, forming a complete set for air separation plant, and engineering project contracting (EPC).

(7) Our company can provide the engineering design and installation service, and technical services and after-sale equipment maintenance.


Product Tags:

cryogenic air separation plant

      

air separation units

      
Quality Coal Mine 350 Nm3/h Air Separation Plant Engineering Project EPC Small Size ASU O2 N2 wholesale

Coal Mine 350 Nm3/h Air Separation Plant Engineering Project EPC Small Size ASU O2 N2 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hangzhou Hangyang Cryogenic Liquefaction Equipment Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)